Home/Schools
A BrightEdge Solar guide
If you manage a school or academy in Yorkshire, rooftop solar is usually judged on whether the buildings and timetable make it practical, and which funding route, if any, actually applies.
Tell us about the site and we will come back with an initial layout and estimate.
Phone is optional. An outward code is enough, for example HU17, LS12 or S9.
This page concentrates on that Yorkshire picture. The national schools guide on brightedgesolar.com covers the wider service in more detail.
Enquiries go to BrightEdge Solar Ltd, based in Beverley. Call 01482 765063 or email max@brightedgesolar.com.
Teaching blocks, kitchens, sports halls and modular classrooms tend to use power during the school day, when an array generates. A well-sized system is therefore mostly used on site in term time. Roof space is often there already. Summer holidays are not wasted generation so long as you have a plan for them: export under a Smart Export Guarantee tariff, or use on site if the buildings stay open for holiday clubs and lettings.
BrightEdge plans installation around term time where it can, with holidays preferred for roof work near busy areas, and working zones kept separate from pupils and staff. The company is used to working on occupied sites and alongside main contractors.
There is no open grant that any school in England can simply apply to for solar panels. The routes that do exist are narrower than a lot of older guidance still suggests.
Great British Energy Solar Partnership. The government has funded rooftop solar on schools and colleges that it selects, with a further wave announced in July 2026. Schools cannot apply directly. If your school has been approached, BrightEdge can talk through what it would mean for the site.
Department for Education PPA pilot. This is the distinctive Yorkshire hook. The DfE is piloting privately funded solar for up to 150 schools and colleges in Yorkshire and the Humber, the East Midlands and the South East. A provider funds, installs, owns and maintains the panels at no upfront cost to the school, and the school buys the electricity at an agreed rate, usually below standard grid tariffs. The department selects the schools and contacts them. It hopes this route will be open more widely from the 2027 to 2028 financial year. From 15 July 2026, PPAs on the school estate need to use the DfE’s own PPA and land-lease templates, and applications are not approved where the roof is in poor condition.
Condition Improvement Fund (CIF). CIF is an annual bidding round for eligible academies, sixth-form colleges and voluntary aided schools. Its core purpose is to keep buildings safe and in good working order, not to pay for solar on its own. If a roof is being replaced through CIF, that is the moment to plan an array alongside the new covering. For 2027 to 2028, applications must be in by midday on 15 December 2026, via the official CIF portal. Larger trusts may instead receive a School Condition Allocation rather than bidding to CIF.
Your own capital, or a PPA outside the pilot. Many trusts fund solar from capital budgets or reserves, sometimes phased across the estate. Buying outright usually gives the best long-term return if the money is there. Community energy groups sometimes fund and own panels on school roofs and sell the power back at an agreed rate.
Closed schemes should not be budgeted against. The Public Sector Decarbonisation Scheme’s Phase 4 was the final phase, and it only funded solar alongside new low-carbon heating.
For a wider map of funding, see grants and funding.
This is a short comparison, not a savings forecast, and no rates are invented here.
Last checked 10 November 2026, against the DfE PPA pilot page and the funding sources listed below.
BrightEdge’s published 2026 rooftop bands, excluding VAT, are about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp, and £50,000–£65,000 for 100 kWp. Flat roofs that need ballasted mounting, long cable runs and access equipment add to the price. Payback depends on term-time use and the unit rate you pay, so it should be modelled from bills or half-hourly data, not a single headline figure. See commercial solar costs in Yorkshire.
Most school systems of this size will also need a G99 application to Northern Powergrid before installation.
There is no open application that any school can send off. Government chooses sites for the Great British Energy Solar Partnership, and the DfE contacts schools selected for its PPA pilot in Yorkshire and the Humber, the East Midlands and the South East. CIF can be relevant when a roof is being replaced, but it is a condition fund, not a solar grant.
A private provider funds, installs, owns and maintains the panels, and the school buys the power at an agreed rate, usually below grid prices. Up to 150 schools and colleges are in the first pilot, in the three regions above. You cannot apply to join; the department gets in touch if your site is selected.
Not as a stand-alone solar bid. CIF pays for condition work such as roofs and heating. If CIF is already replacing a roof, it is the right time to design solar into that project. Check the current official guidance, because rounds and rules change.
Yes, with planning. BrightEdge prefers school holidays for roof work near busy areas and keeps working zones separate from pupils and staff.
Often a school rooftop system can fall under permitted development, subject to conditions. Listed buildings and conservation areas are different, and the site should be checked at survey.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.
