Home/Industrial & warehouses
A BrightEdge Solar guide
Large metal roofs, weekday daytime demand and a three-phase supply are why warehouses, factories and industrial units across Yorkshire are often a strong fit for rooftop solar.
Tell us about the site and we will come back with an initial layout and estimate.
Phone is optional. An outward code is enough, for example HU17, LS12 or S9.
This page is a decision guide for occupiers and landlords looking at systems of about 30 to 500 kWp in the East Riding, Hull, York and North Yorkshire, West Yorkshire and South Yorkshire. The national warehouse service page remains on brightedgesolar.com.
To ask about a particular building, call 01482 765063 or email max@brightedgesolar.com.
Typical size. This guide is for industrial units and warehouses of about 30 to 500 kWp. BrightEdge’s published 2026 rooftop bands, excluding VAT, are about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp, and £50,000–£65,000 for 100 kWp, with larger roofs usually priced at about £420–£650 per kilowatt-peak. See costs and payback.
What a survey checks first. The roof covering and structure, safe access, the electrical supply, and whether the occupier or the landlord must consent. Those points usually move the price more than the panel count.
Who must consent on a leased unit. The landlord, and often the superior landlord or managing agent on a multi-let estate. A letter of consent should be in place before anyone orders kit. The occupier still needs to be happy with yard access and shutdowns.
Most modern profiled-metal (trapezoidal) roofs can take an array, but that should not be assumed. The structure has to carry the extra load, the covering should outlast the panels, and the grid has to accept the connection. On larger systems BrightEdge arranges a structural assessment. If the roof will need replacing in the next few years, it is better to know that now and, where it makes sense, to re-cover and fit the solar as one project.
Fibre-cement roofs need particular care, because older sheets may contain asbestos and some cannot take foot traffic or fixings. BrightEdge does not fix panels straight onto asbestos: the usual route is to overclad and mount the array on the new sheeting. Flat and membrane roofs can take ballasted systems, subject to structural checks and the roof warranty, as on the new-build care home in Clifton, York, where a 47.08 kWp array was kept light enough that the flat roof needed no strengthening.
If you lease the unit, you will need the landlord’s consent. A power purchase agreement can sometimes suit both parties, because a funder pays for the system and the occupier buys the power at an agreed rate. Your building insurer should also be told; BrightEdge provides the documents insurers usually ask for.
Northern Powergrid runs the distribution network across Yorkshire and northern Lincolnshire. Almost every commercial system needs a G99 application before installation, because it sits above the G98 threshold of 16 amps per phase. BrightEdge prepares and submits the application. In their experience this typically adds eight to twelve weeks before installation. Where a site already has a G99 approval, the new inverter can sometimes be sized to fit within it. That is what happened on an 86 kWp industrial roof in Doncaster, where the inverter was matched to an existing approval granted for an older 60 kW unit, and export limitation was designed in.
If the network operator limits export, export limitation lets you keep using everything you generate on site. Surplus that you do export can be paid for under the Smart Export Guarantee, where a supplier offers a tariff.
A 50–150 kWp roof typically takes about one to two weeks on site, once the grid approval is in place. Work can be planned around loading bays, walkways and shifts, with electrical connection often scheduled out of hours so downtime is brief. Rooflights are protected while the team is on the roof, and a permanent safety line can be fitted if you want safe access later. The Doncaster job included temporary covers over the rooflights and a 72 m man-safe lifeline.
BrightEdge’s published 2026 bands, excluding VAT, are about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp, and £50,000–£65,000 for 100 kWp. Systems of 150 kWp and above are usually priced at about £420–£650 per kilowatt-peak. Scaffolding, roof-safety systems and more difficult coverings push a job towards the upper end. VAT is 20% on commercial installations and is usually reclaimable by VAT-registered businesses. See commercial solar costs in Yorkshire and, for the national cost guide, brightedgesolar.com.
Tax relief, including the Annual Investment Allowance, is covered on the tax relief page. There is no national grant that any business can simply apply for; local schemes are summarised under grants and funding.
Public examples include 257 kWp on an industrial roof for Integra Buildings in Paull, 69.16 kWp for Pyronix Ltd in Rotherham on a newly re-roofed manufacturing building, and the 86 kWp Doncaster unit already mentioned. A 51.03 kWp east/west array on the change house at Woodsmith Mine, near Whitby, shows how a flat, exposed roof can be designed for higher wind loads. Full write-ups are in the case studies.
Most modern metal roofs can, but the structure and condition should be checked first. On larger systems BrightEdge arranges a structural assessment.
Yes, with the landlord’s consent. BrightEdge can provide the information landlords usually need, and a power purchase agreement can suit a leased building.
Panels are not fixed straight onto asbestos. The roof is overclad with new sheeting and the array is mounted on that. Modern fibre-cement roofs can often take panels directly once they have been checked.
A 50–150 kWp roof typically takes about one to two weeks on site. The G99 application typically adds eight to twelve weeks beforehand, in BrightEdge’s experience.
Only briefly, for the final connection, which can be scheduled out of hours.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.
