A BrightEdge Solar guide
Commercial solar in Yorkshire is not one market. The roofs, the daytime loads and even the feel of the grid connection change as you move from the Humber ports to the Wolds, the West Yorkshire valleys and the South Yorkshire manufacturing towns. This page is a single guide to those differences. It is not a set of thin town pages, and it does not try to replace BrightEdge’s local service pages on brightedgesolar.com for Hull, Beverley or individual towns.
The installer behind this site is BrightEdge Solar Ltd, based at Colonial House, Swinemoor Lane, Beverley. Call 01482 765063 or email max@brightedgesolar.com.
Northern Powergrid runs the distribution network across all four areas below, so the G99 application is made to the same operator. In BrightEdge’s experience it typically adds eight to twelve weeks before installation.
This is BrightEdge’s home patch: farms and food businesses from the Wolds to Holderness, logistics and manufacturing along the M62 and the Humber, and coastal hospitality and workshops. Public examples already named on the main site include 257 kWp for Integra Buildings in Paull, 17.63 kWp for DW Autos in Withernsea, 19.8 kWp on a farm shed at North Dalton, 19.8 kWp across two agricultural sheds at Ellerton, and a 29 kWp ground-mounted array at Wapplington, near Pocklington.
Hull’s city commercial and domestic pages stay on the main website, so that searches such as “solar panels Hull” are not pulled onto this domain. If your site is a commercial roof in or around the city, start here or on the industrial guide, and use BrightEdge’s commercial solar in Hull page for the city-specific service detail.
North Yorkshire mixes city-edge commercial buildings, a large farming hinterland, and exposed coastal and moorland sites. Public examples include a 47.08 kWp ballasted array on a new-build care home in Clifton, York, a 24.64 kWp re-clad farm store at Little Habton, and a 51.03 kWp east/west flat-roof system on the change house at Woodsmith Mine, near Whitby. Rural supplies and higher wind loads are often part of the design conversation here; see solar for farms.
West Yorkshire’s commercial roofs are often mills, factories and trade units in the valleys and along the urban fringe — Huddersfield, Halifax, Bradford, Leeds, Wakefield and the towns between them. Daytime industrial loads and three-phase supplies are common. BrightEdge covers the county from Beverley on the same Northern Powergrid network. This page does not invent West Yorkshire case studies the main site has not published; the industrial approach, roof checks and programme are those set out in the warehouse guide.
Sheffield, Rotherham, Doncaster and Barnsley have the large industrial and distribution roofs that often suit a 50 to 500 kWp array. Public examples include 69.16 kWp for Pyronix Ltd in Rotherham, on a newly re-roofed manufacturing building with shade from a neighbouring structure, and 86 kWp on an industrial unit in Doncaster, designed around an existing G99 approval and a live roof with rooflights. See the industrial page for the checks that come before a quote, and costs for the 2026 price bands.
Yes. BrightEdge is based in Beverley and installs commercial solar across the East Riding, Hull, York and North Yorkshire, West Yorkshire and South Yorkshire.
Northern Powergrid, across Yorkshire and northern Lincolnshire.
Use this site for the Yorkshire commercial guides, and BrightEdge’s main Hull commercial page for city-specific service detail. Homeowners looking for domestic solar in Hull should use brightedgesolar.com, not this site.
East, North and South Yorkshire have public examples named on the main site and summarised above. This page does not invent West Yorkshire project figures that have not been published there.
Send a site postcode, building type and a recent bill. BrightEdge will come back with an initial view.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.
