If you are comparing commercial solar in Yorkshire, the useful starting point is a typical installed cost for the size of roof you actually have, plus a clear view of what will move that figure. The bands below are BrightEdge Solar’s published 2026 ranges for rooftop systems, excluding VAT. They are starting bands, not a quote. The national cost guide, with more worked examples, remains on brightedgesolar.com.
Call 01482 765063 or email max@brightedgesolar.com if you want a figure built from your own bills.
For a commercial rooftop, BrightEdge currently quotes in these bands, excluding VAT. Last checked 10 November 2026.
| Rooftop size | Typical use | Published 2026 band (ex VAT) |
|---|---|---|
| 30 kWp | often a small workshop, garage or office | £17,000–£21,000 |
| 50 kWp | a mid-size unit or farm building | £28,000–£37,000 |
| 100 kWp | a warehouse, factory or large barn | £50,000–£65,000 |
| 150 kWp and above | larger industrial roofs | about £420–£650 per kilowatt-peak |
VAT is charged at 20% on commercial installations. VAT-registered businesses can usually reclaim it. Bigger systems generally cost less per kilowatt-peak, because fixed items such as scaffolding, design and grid paperwork are spread further.
These bands cover the solar array itself. Overcladding an asbestos roof, a full re-clad, ground mounting, long cable runs and specialist roof-safety systems are priced after survey, because they vary so much between sites.
The roof matters more than almost anything else. Sound trapezoidal steel is typically quicker to work on than a flat membrane that needs a ballasted system, or a fibre-cement covering that has to be checked or overclad. Access and safety on a tall or busy site — scaffolding, edge protection, rooflight covers, sometimes a permanent lifeline — are a real part of the cost, as on the 86 kWp industrial roof in Doncaster.
The electrical supply and the grid connection matter too. Almost every commercial system in Yorkshire needs a G99 application to Northern Powergrid. In BrightEdge’s experience that typically adds eight to twelve weeks before installation, and on a constrained rural network the offer may limit export or require extra work. Several buildings or meters on one site also add inverters, metering and applications.
Where BrightEdge has published a design estimate on a public case study, it is clearly labelled as an estimate. For example, the 17.63 kWp garage array for DW Autos in Withernsea has an MCS expected generation of 14,885 kWh a year and an estimated payback of about four years three months. Those figures belong to that job and tariff assumption; they are not a promise for another roof.
Buying outright usually gives the best long-term return, especially once capital allowances and business rates relief are taken into account. Finance or hire purchase spreads the cost. A power purchase agreement means a funder pays for the system and you buy the power at an agreed rate, which can also help where the building is leased.
There is no national grant that any business can simply apply for. Local schemes in Yorkshire open and close, and many UK Shared Prosperity Fund business energy grants ended in March 2026, so they should be checked at the time of a quote rather than built into a budget as a certainty.
As an illustration only, a 100 kWp warehouse roof in Yorkshire priced in the middle of BrightEdge’s published band would sit around £57,500 excluding VAT, before any reclaim of the 20% VAT. That is not a quote for a named site. The roof, access, scaffolding and the G99 offer would move it, and payback would still have to be modelled from that site’s meter data and unit rate.
Public jobs already named on BrightEdge’s site include 257 kWp for Integra Buildings in Paull, 69.16 kWp for Pyronix in Rotherham, 86 kWp in Doncaster, 19.8 kWp on a farm shed at North Dalton, and 24.64 kWp on the re-clad store at Little Habton. They show the spread from a coastal garage to a large industrial roof. They are not a menu of prices. Details are in the case studies.
BrightEdge’s 2026 guide band is £28,000–£37,000 excluding VAT for a rooftop system of that size. The roof, access and grid requirements decide where a job lands in the range.
Typically £50,000–£65,000 excluding VAT for a rooftop array. Larger roofs are usually priced per kilowatt-peak, at about £420–£650.
Yes, at 20%. VAT-registered businesses can usually reclaim it. Some charity buildings currently qualify for 0% VAT until 31 March 2027; that relief does not apply to ordinary commercial premises.
No. Payback has to be built from your unit rate and how much generation you use on site. Ask for a model based on your bills or half-hourly data.
BrightEdge prepares and submits the G99 application. Any fees charged by the network operator should be shown separately in the quote, so you can compare like for like.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.