A BrightEdge Solar guide
Call 01482 765063 or email max@brightedgesolar.com if you want the tax position set beside a design for your own roof.
Companies. A limited company usually starts with the Annual Investment Allowance, which is £1 million, and can then look at the 50% special-rate first-year allowance if that AIA has already been used. Full expensing and the 40% first-year allowance do not apply to solar panels.
Sole traders. A sole trader can usually use the AIA in the same way. The 50% first-year allowance is for companies only. If you use the cash basis, GOV.UK says capital allowances on equipment are generally replaced by treating the cost as an expense, except for cars; ask your accountant which basis you are on.
Partnerships, including many farms. A partnership can usually claim the AIA on qualifying plant. The 50% first-year allowance will not be available, but at typical farm-system sizes the AIA is the relief that matters.
This split is a short guide to who should read which paragraph, not tax advice.
Solar panels are special-rate plant and machinery. GOV.UK lists them in the special-rate pool, and the Capital Allowances Act 2001 puts expenditure on the provision of solar panels in that pool. The writing-down allowance on anything left in the pool is 6% a year, on a reducing balance.
Most businesses never need to rely on that 6%. The Annual Investment Allowance lets companies, sole traders and partnerships deduct the full cost of qualifying plant in the year of purchase, up to £1 million. For almost every 30 to 500 kWp rooftop we are talking about on this site, the whole system will usually sit inside that annual limit, provided the business has not already used the allowance on other spending in the same period. Groups of companies share one AIA, and short accounting periods reduce it.
If a company has already used its AIA, it may be able to claim a 50% first-year allowance on remaining special-rate expenditure, for new and unused assets bought from 1 April 2023. The other half then goes into the special-rate pool. That 50% allowance is for companies only, which rarely matters for a farming partnership, because few unincorporated businesses spend more than £1 million on plant in a year.
Two reliefs that are often mentioned in 2026 do not apply to solar panels. Full expensing is for main-rate plant only. The 40% first-year allowance, for certain plant bought on or after 1 January 2026, also requires assets that qualify for the main rate of writing-down allowance. Solar panels are special-rate, so they do not qualify for either.
Installation, scaffolding and electrical work that is part of providing the panels is normally included in the cost of the plant. Hire-purchase customers can generally claim AIA once they start using the system, but not on the interest. Under a power purchase agreement the funder usually owns the panels and claims the allowances, not you.
Separately from capital allowances, in England eligible plant and machinery used for on-site renewable generation and storage, including rooftop solar, is exempt from business rates until 31 March 2035. Check the position with your rating adviser, because the exemption is for eligible on-site equipment and is time-limited. Rules last checked 10 November 2026, against GOV.UK and the legislation cited in the sources.
A farming partnership or sole trader buying a shed-roof array can usually use the AIA in the same way as a company. The 50% first-year allowance will not be available to them, but the AIA is the relief that matters at typical farm-system sizes. If you use the cash basis, GOV.UK says capital allowances on equipment are generally replaced by treating the cost as an expense, except for cars; ask your accountant which basis you are on.
Public Yorkshire examples of the sort of system this usually covers include the 19.8 kWp shed at North Dalton and the 24.64 kWp re-clad store at Little Habton, as well as larger industrial roofs such as 69.16 kWp at Pyronix in Rotherham. See solar for farms and industrial and warehouse solar.
Yes. They are special-rate plant. Most businesses can claim 100% in year one through the Annual Investment Allowance, up to £1 million.
No. Both of those reliefs are for main-rate plant. Solar panels are special-rate, so companies use the AIA first and, if needed, the 50% special-rate first-year allowance.
Yes, through the AIA, unless they use the cash basis, where equipment is generally treated as an expense. The 50% first-year allowance is for companies only.
In England, eligible on-site renewable generation and storage equipment is exempt until 31 March 2035. Confirm this with your rating adviser.
No. It is a general summary of the published rules. Speak to your accountant before you claim.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.
