A BrightEdge Solar guide
This site, commercialsolaryorkshire.co.uk, is a guide to commercial solar PV across Yorkshire. It is published by BrightEdge Solar Ltd, the installer that will handle your enquiry. It is not a separate company, and it is not an independent advice bureau.
BrightEdge Solar Ltd is registered at Companies House under company number 14869944. The registered office is Colonial House, Swinemoor Lane, Beverley, HU17 0LS. Max Johnston is the Managing Director. The company was founded by Max Johnston and Scott Jon, and the wider company story, including domestic work in Hull and the East Riding, sits on the main about page.
On its live commercial pages, BrightEdge states that it is:
Commercial installations carry a 24-month workmanship warranty, alongside the manufacturers’ product warranties. Electrical staff are employed in-house; long-term roofing partners are used where specialist roof coverings need them.
Those accreditations are taken from BrightEdge’s own website. They have not been re-checked on the public MCS or CHAS registers for this draft.
BrightEdge is based in Beverley, in the East Riding, and installs commercial solar across Yorkshire — the East Riding and Hull, York and North Yorkshire, West Yorkshire, and South Yorkshire. Public examples of that work are named on the areas page and in the case studies on the main site. Surveys and aftercare visits are run from the Beverley office.
The pages here are written as Yorkshire guides: farms, schools, industrial units and warehouses, costs, tax relief, grants, G99 grid connection and the areas we cover. Case studies stay on brightedgesolar.com, and this site only names jobs that are already public there.
This is not a battery-led site, and it does not cover domestic solar or Warm Homes work. If you need those, use the main website.
Enquiries
Send your site address and a recent electricity bill, or half-hourly data if you have it. BrightEdge will come back with an initial layout and estimate, then arrange a survey if it is worth pursuing.
Call 01482 765063 or email max@brightedgesolar.com.
BrightEdge Solar Ltd, Beverley. MCS certified (NIC-601602). CHAS Elite. RECC. NICEIC. 24-month commercial workmanship warranty.
A four-step enquiry form. Notifications go to max@brightedgesolar.com. Phone is optional.
